Home / Services / Design & DPR Preparation
Service 02Assam · Meghalaya · Sikkim

DPR preparation for roads and bridges in Guwahati, Assam

FAR Infrastructures prepares Detailed Project Reports for rural roads, state roads and RCC bridges. Since 2011 we have delivered DPRs for PWRD Assam, PWD (Border Roads), PWD Bodoland Territorial Council and PMGSY divisions across Assam.

What's included

  • 01Topographical survey with total station, GPS and DGPS, WGS 84 referenced
  • 02Traffic survey and sub-soil investigation (SSI)
  • 03Road alignment, pavement and RCC bridge design to IRC codes
  • 04Drawings, quantities, cost estimates and BoQ
  • 05Economic analysis and tender documents
  • 06DPR volumes ready for technical sanction

Schemes we work on

PMGSY-IIIPMGSY-IVPM-DAJGUAPM-AJAYAsom Mala 2.0ARRBPNLCPR

Common questions

How long does a PMGSY road DPR take?

It depends on the number and length of roads. Survey and design usually run in parallel across a package; tell us the scope and we will give you a programme.

Do you also do the soil investigation?

Yes. Soil testing and SSI reports are done in-house as part of the DPR, including SSI for bridge foundations.

Which areas do you cover?

All districts of Assam, and road projects in Meghalaya and Sikkim.

Talk to us

Have a project in mind?

Tell us the location, scope and timeline. Our office is in Ganeshguri, Guwahati, open Monday to Saturday, 10 am to 6 pm.

Other services